PROGRAMME

Validate, protect, industrialise.

SpaceDrone-DataLink progresses through coherent stages to reduce technical, industrial and commercial risk while keeping sensitive programme elements offline. Each milestone prepares the next and strengthens scale-up readiness.

Proofs of conceptEmbedded AICybersecurityQualificationIndustrialisation
SPACEDRONE-DATALINK / SHC
Optical communication terminal on a photonic validation bench.

PUBLIC MILESTONES

Progress built on concrete validation.

The programme combines design, prototyping, testing, intellectual-property protection and industrial preparation through a progressive, measurable trajectory.

01

Ground-to-ground optical link

Very-high-throughput optical communication proof of concept.

02

Pointing on a mobile platform

Demonstration of optical pointing and tracking on a UAV.

03

Intellectual-property strategy

Patent filings and invention-family structuring.

04

Île-de-France base

Expansion of the photonics programme and industrial partnerships.

SYSTEM DEMONSTRATION

Connecting laboratory validation to field service.

Trials check how SHC behaves during normal operation and when the laser link deteriorates. They verify that the system recognises the problem, uses the planned backup solution, informs the operator and returns to normal operation when conditions improve. The same scenarios verify that data protection, equipment identity and message integrity remain assured while links change.

Photonics programme and validation bench.

EXECUTION PILLARS

Managing development as an industrial programme.

R&D

Develop and test the laser link, backup radio and onboard assistance software.

IP

Protect the core architecture and differentiating mechanisms.

PARTNERSHIPS

Engage specialist laboratories, integrators and suppliers.

QUALIFICATION

Build reproducible evidence in representative environments.

SUPPLY CHAIN

Secure critical components, processes, metrology and capabilities.

MARKETS

Co-design demonstrators with operators and end users.

10 Gbpsground-to-ground PoC
7patents filed
2024first validations

Detailed schedules, budgets, internal architectures and unpublished intellectual-property information remain offline. They are shared only under a contractual framework appropriate to the need.

Explore next

Build the ecosystem for scale-up.

The trajectory relies on targeted cooperation with clearly defined responsibilities and IP.

Explore next